Kowloon Canton Railway. BRITISH SECTION ESTIMATE. 87

Main Head Bridges.

Sub. Head Major No.47.

Work One 60' 0,(T) and four 201 0.D. at Chain 108:225.

DESCRIPTION Quantity Unit Rate Cts. AMOUNT Excavation in founds. 61000 10/- 610 00. Timbering and Pumping. 1000 00. 2800 Concrete in founds. 35/ 4480 00. Masonry in Footings. 4850 40/- 1940 00 Superstructure. 21350 40/- 8540 00. Coping and Bedstones. 410 2/- 8.0 00. Dry Stone behind abuts. 700 10/- 7 00 One 60' Span Girder landed in Kowloon. 1 5500/- each 5500 00. Four 201 Span Girders landed in Kowloon. 4 500/- 2000 00. One 60' Span erection and painting. 1 1000/- 1000 00 Four 201 Span erection and painting. 4 100/- 400 00. Total 26297 00. Contingencies 10% 2629. 70 Grand Total 28926 70.

Page 28

1

bro CUB. No. 24.

Edit History

2026-06-04 21:20:19 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Page 28 Kowloon Canton Railway. BRITISH SECTION ESTIMATE. 87 Main Head Bridges. Sub. Head Major No.47. Work One 60' 0,(T) and four 201 0.D. at Chain 108:225. DESCRIPTION Quantity Unit Rate Cts. AMOUNT Excavation in founds. 61000 10/- 610 00. Timbering and Pumping. 1000 00. 2800 Concrete in founds. 35/ 4480 00. Masonry in Footings. 4850 40/- 1940 00 Superstructure. 21350 40/- 8540 00. Coping and Bedstones. 410 2/- 8.0 00. Dry Stone behind abuts. 700 10/- 7 00 One 60' Span Girder landed in Kowloon. 1 5500/- each 5500 00. Four 201 Span Girders landed in Kowloon. 4 500/- 2000 00. One 60' Span erection and painting. 1 1000/- 1000 00 Four 201 Span erection and painting. 4 100/- 400 00. Total 26297 00. Contingencies 10% 2629. 70 Grand Total 28926 70. Page 28 1 bro CUB. No. 24.
Baseline (Original)
28 .♥ewlisЯ notneD noolwo 1 VOITS32 HAITISIEL .3TAMIT23 bro CUB. No. 24. Tkowloon Canton Canton Railway. BRITISH SECTION ESTIMATE. 87 ** bast ninlà Main Head Bridges. best due Sub. Head Major No.47. * นางย Work One 60' 0,(T) and four 201 0.D. at Chain 108:225. AMOUNT. Quantity, DESCRIPTION. Rate. Unit. * Cts. 61000 Excavation in founds, 10/- 610 00. Item. Timbering and Pumping. 1000 00. 2800 Concrete in founds. 35/ 4480 00. 4850 Masonry in Footings. 40/- 1940 00 21350 # Superstructure. 40/- 8540 00. 410 W Coping and Bedstones. 2/- 8.0 00. 700 Dry Stone behind abuts. i 10/- 7 00 1 One Four 60' Span Girder landed in Kowloon, 201 Spane Girders landed in Kowloon. 5500/- each 5500 00. 500/- # 2000 00. One 60' Span erection and painting. 1000/- 1000 00 Pour 201 " # 100/- 400 00. IBIOT 201 25isnignino) latot Total Contingincies 10% Grand Total 26297 00. 2629. 70 28926 70.
2026-06-04 21:20:19 · Baseline
View content

28

.♥ewlisЯ notneD noolwo

1

VOITS32 HAITISIEL

.3TAMIT23

bro CUB. No. 24.

Tkowloon Canton

Canton Railway.

BRITISH SECTION

ESTIMATE.

87

** bast ninlà

Main Head

Bridges.

best due

Sub. Head Major No.47.

*

นางย

Work One 60' 0,(T) and four 201 0.D.

at Chain 108:225.

AMOUNT.

Quantity,

DESCRIPTION.

Rate.

Unit.

*

Cts.

61000 Excavation in founds,

10/-

610

00.

Item.

Timbering and Pumping.

1000

00.

2800

Concrete in founds.

35/

4480

00.

4850

Masonry in Footings.

40/-

1940

00

21350

#

Superstructure.

40/-

8540

00.

410

W Coping and Bedstones.

2/-

8.0 00.

700

Dry Stone behind abuts.

i

10/-

7

00

1

One

Four

60' Span Girder landed in Kowloon,

201 Spane Girders landed in Kowloon.

5500/- each 5500 00.

500/-

#

2000 00.

One

60' Span erection and painting.

1000/-

1000 00

Pour

201

"

#

100/-

400 00.

IBIOT

201 25isnignino)

latot bÜ

Total

Contingincies 10%

Grand Total

26297 00.

2629. 70

28926

70.